All of the material to be dredged will be removed using hydraulic means and pumped via pipeline to the adjacent beach areas, which include Misquamicut State Beach, Wuskenau Beach and the Westerly Town Beach. All depths refer to the plane of Mean Low Water (MLW). Approximately 72,000 cubic yards (CY) of sand will be dredged from approximately 12 acres of flood tidal shoal to a depth of -2.5 feet MLW with an allowable overdepth of 6 inches, and an additional 2.8 acres within the breachway to a depth of -9 feet MLW with an allowable overdepth of 1 foot. ![]() James Thomas Apartments Development Site Improvement Projectĭredging project located at Winnapaug Pond. White Brook and Broad Brook Sediment Basins Maintenance DredgingĢ020 Dead Neck Sampson's Island Dredging and Beach Nourishment (Phase 3) Maintenance Dredging of The Newburyport Harbor, Massachusetts Federal Navigation Projectīoston Harbor Navigation Improvement Project-Phase 3 Rock Removalīutler's Pond Dredging and Storm Water Treatment ![]() Muddy River Flood Damage Reduction - Phase 2, Boston and Brookline, Massachusetts Repairs to The Federal Navigation Project Breakwater at Hyannis Harbor, Barnstable, MA
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |